| RSK-001 |
Container Depot |
Hardstand & Stack Operations |
Reach stacker punctures an un-cleared import container carrying toxic Class 8 Dangerous Goods, causing structural failure, hazardous chemical spill, and environmental breach in the open yard. |
{{cite:OHS-ACT}} · {{cite:ADG-CODE}} · {{cite:BIOSECURITY-ACT}} · {{cite:CUSTOMS-ACT}} |
3 |
5 |
15 / High |
Pre-arrival manifest mapping in TMS to flag DG containers (PR-TP-004). Dedicated bunded DAFF-approved quarantine zones for underbond cargo. Heavy machinery exclusion zones around flagged DG containers. Regular hardstand integrity inspections (PR-CM-005). |
2 |
3 |
6 / Medium |
Depot Operations Manager |
2027-03-01 |
| RSK-002 |
Warehouse |
Inbound Devanning Bay |
An un-cleared import container is devanned while infested with exotic biosecurity pests (e.g. Khapra beetle). Pests escape into the facility, contaminating stored food items and export-bound goods. |
{{cite:BIOSECURITY-ACT}} · {{cite:HACCP-STANDARD}} |
2 |
5 |
10 / Substantial |
Devanning restricted to isolated Approved Arrangement bays (CP04). Rapid containment protocols and immediate DAFF reporting (ERP09). Pest control compliant with {{cite:HACCP-STANDARD}} — no toxic baits in food zones. Pre-devanning container inspection checklist. |
1 |
4 |
4 / Low |
Biosecurity Compliance Officer |
2027-03-01 |
| RSK-003 |
Warehouse |
Racking Aisles |
Forklift impacts an export-ready food rack causing structural collapse, resulting in severe operator injury and cross-contamination of adjacent food stocks. |
{{cite:OHS-ACT}} · {{cite:HACCP-STANDARD}} · {{cite:BIOSECURITY-ACT}} |
3 |
4 |
12 / Substantial |
Heavy-duty bolt-down racking aisle end protectors installed. Warehouse traffic management separating pedestrians from forklifts (PR-WH-001). Batch isolation controls via TMS. Pre-shift forklift prestart checks (PR-TP-007). Regular racking integrity inspections (PR-CM-005). |
1 |
4 |
4 / Low |
Warehouse Site Manager |
2027-03-01 |
| RSK-004 |
Container Depot · Warehouse · Parking |
Outbound Dispatch |
A heavy vehicle is co-loaded with export food products and poorly secured Class 3 flammable liquid drums. Drums shift and leak during transport, triggering a highway incident and food contamination. |
{{cite:HVNL}} · {{cite:ADG-CODE}} · {{cite:HACCP-STANDARD}} · {{cite:OHS-ACT}} |
3 |
5 |
15 / High |
TMS load planning rules blocking incompatible DG and food co-loading (PR-TP-004). Mandatory CoR pre-dispatch load restraint checklist (PR-CM-003). Weighbridge integration (PR-CM-002). DG segregation per {{cite:ADG-CODE}} enforced at loading (HB03). |
2 |
3 |
6 / Medium |
Logistics & Transport Manager |
2027-03-01 |
| RSK-005 |
Warehouse |
Export Packing Line |
Warehouse team applies non-approved pesticides in the food-grade export area to address an infestation. Chemical residues breach export market access criteria, triggering a biosecurity non-conformance. |
{{cite:BIOSECURITY-ACT}} · {{cite:HACCP-STANDARD}} · {{cite:ADG-CODE}} |
3 |
4 |
12 / Substantial |
Pest control program mapped to Approved Registered Establishment Operations Manual (CP04). Pre-authorisation logs mandatory for any chemical introduction into food-grade areas. Independent third-party sanitation audits quarterly. DG storage per {{cite:ADG-CODE}} (HB03). |
1 |
4 |
4 / Low |
Quality Assurance Lead |
2027-03-01 |
| RSK-006 |
Parking · Container Depot |
Transport Operations |
A heavy vehicle driver exceeds {{cite:HVNL}} work and rest hour limits due to inadequate scheduling or failure to declare prior work, resulting in a fatigue-related road incident. |
{{cite:HVNL}} · {{cite:OHS-ACT}} |
3 |
5 |
15 / High |
Fatigue management scheduling controls in TMS (PR-TP-004). Driver daily workcard recording work and rest hours (PR-TP-003). Pre-trip fatigue declaration via Gearbox prestart app (PR-TP-006). Fatigue obligations covered in onboarding (HB01). Drug and alcohol testing (PR-CM-001). |
2 |
5 |
10 / Substantial |
Logistics & Transport Manager |
2027-03-01 |
| RSK-007 |
Container Depot |
Diesel Storage |
Loss of containment from the onsite diesel storage tank results in a fuel spill reaching stormwater drains, causing an environmental incident and regulatory breach. |
{{cite:OHS-ACT}} · {{cite:ADG-CODE}} |
2 |
4 |
8 / Medium |
Bunded containment around diesel tank meeting EPA requirements (CP08). Onsite diesel tank operating procedure (PR-DP-001). Emergency response plan for spill (ERP08). Stormwater control procedure (PR-DP-003). Regular tank integrity inspections (PR-CM-005). |
1 |
3 |
3 / Low |
Depot Operations Manager |
2027-03-01 |
| RSK-008 |
Container Depot · Warehouse |
Customs Controlled Storage |
Underbond cargo is accessed, moved, or devanned without proper Customs authority, resulting in a {{cite:CUSTOMS-ACT}} breach and potential suspension of the 77G depot licence. |
{{cite:CUSTOMS-ACT}} · {{cite:BIOSECURITY-ACT}} |
2 |
4 |
8 / Medium |
77G depot licence conditions and access controls (CP05). TMS underbond cargo flagging and movement authorisation workflow. Staff training on Customs controlled cargo obligations (HB00). Regular ABF compliance self-assessments. |
1 |
4 |
4 / Low |
Biosecurity Compliance Officer |
2027-03-01 |
| RSK-009 |
Container Depot · Warehouse · Office |
General Operations |
Worker sustains a musculoskeletal injury during manual handling of freight or equipment, resulting in lost time, a workers compensation claim, and potential {{cite:OHS-ACT}} investigation. |
{{cite:OHS-ACT}} |
4 |
2 |
8 / Medium |
Manual handling guidance in induction (HB00). Incident reporting procedure (PR-CM-004). Mechanical aids available and maintained (PR-CM-005). Return to work managed per {{cite:OHS-ACT}} obligations (PL-SM). |
3 |
2 |
6 / Medium |
Compliance & Maintenance |
2027-09-01 |
| RSK-010 |
Office · Container Depot · Warehouse · Parking |
All Operations |
Workers experience chronic work-related stress, burnout, or psychological harm due to high workloads, poor communication, or workplace conflict, resulting in absenteeism, turnover, and potential psychosocial risk breach. |
{{cite:OHS-ACT}} · {{cite:FAIR-WORK-ACT}} |
3 |
3 |
9 / Medium |
Complaint handling procedure (PR-HR-002). Workplace conduct and ethics obligations (PL-WC). People & Culture policy covering wellbeing (PL-PC). Incident reporting for psychosocial events (PR-CM-004). |
2 |
3 |
6 / Medium |
Human Resources |
2027-09-01 |